RUSHING | GP | GS | ATT | YDS | AVG | TD | YDS/G | FUM | LST | TD% | LNG |
|---|---|---|---|---|---|---|---|---|---|---|---|
2026-27 | 5 | 4 | 73 | 271 | 3.7 | 3 | 54.2 | 2 | 2 | 4.1 | 17 |
2025-26 | 9 | 6 | 124 | 545 | 4.4 | 4 | 60.6 | 1 | 0 | 3.2 | 54 |
RECEIVING | GP | GS | TGT | REC | YDS | AVG | TD | YDS/G | TD% | DROP | FUM | LST |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
2026-27 | 5 | 4 | 6 | 5 | 35 | 7.0 | 0 | 7.0 | 0.0 | 0 | ||
2025-26 | 9 | 6 | 35 | 32 | 192 | 6.0 | 1 | 21.3 | 3.1 | 0 |